COMPLETED Projects

our completed project lists

naga-2-3.png

PROJECT NAME: NAGA 2&3 – DRILLING RIG

OWNER: STANDARD DRILLING AS

BUILDER: DRYDOCKS WORLD (GRAHA)

PT. MSP awarded the project and in time completed. All E&I Work Installation ±12,000mtrs cable ladder, ±15,500 cable runs (±500,000mtrs cables)

jack-up-drilling-perro-negro-6.png

PROJECT NAME: Jack Up Drilling PERRO NEGRO 6 (L203) & NEGRO 8 (L204)

OwnerSAIPEM
BuilderDRYDOCKS WORLD GRAHA (AS)
Our Job Year2010
Cable ladders & Trays12,000 Mtrs
Cable Runs13,600 Runs
Cable Meters620,000 Mtrs
Equipments Installations3,600 Items
project-oil-rig.png

PROJECT OIL RIG’S

Project DetailsL209&G8001
ClientPetronas
BuildersDDW-PoxOcean Graha (BATAM)

PROJECT NAME: SERVICE JACK NORA (L206)

OwnerTERAS SUNRISE
BuilderASL SHIPYARD
Our Job Year2014
Cable ladders & Trays10,000 Mtrs
Cable Runs11.000 Runs
Cable Meters430,000 Mtrs
Equipments Installations2,200 Items

PROJECT NAME: MULTI PURPOSE VESSEL 7063 (NORSHORE ATLANTIC)

OwnerNORSHORE
BuilderBATAMEC
Our Job Year2010
Cable ladders & Trays4,000 Mtrs
Cable Runs9.000 Runs
Cable Meters240,000 Mtrs
Equipments Installations950 Items

PROJECT NAME: CENDOR – E PHASE 2 EPSO

OWNER: PIEZZOE

BUILDER: WASCO ENGINEERING INDONESIA

PT. MSP awarded the project and in time completed. All E&I Work Installation ±350mtrs cable ladder, ±950 cable runs (±26,000mtrs cables)

PROJECT NAME: APLNG -UTILITY SUB-STATION

OWNER: ASIA PACIFIC LNG

BUILDER: SIEMENS

PT. MSP awarded the project and in time completed. All E&I Work Installation ±800mtrs cable ladder, ±1,250 cable runs (±42,000mtrs cables)

yamal-lng-electrical.png

PROJECT NAME: YAMAL LNG ELECTRICAL SUBSTATION (8 SUBSTATIONS)

OwnerYAMGAZ
BuilderSIEMENS PTE LTD
Our Job Year2015
Cable ladders & Trays16,658 Mtrs
Cable Runs4,330 Lths
Cable Meters197,408 Mtrs
Equipments Installations3,710 Items
Tubing Installations5,232 Mtrs
jangkrik-complex-project-1.png

PROJECT NAME: JANGKRIK COMPLEX PROJECT

OwnerJV – SAIPEM, CHIYODA, TRIPATRA
BuilderSIEMENS PTE LTD
Our Job Year2015
Cable ladders & Trays1,563 Mtrs
Cable Runs2,290 Lths
Cable Meters83,151 Mtrs
ehouse-mv27.png

PROJECT NAME: E HOUSE – MV27

OWNER: MODEC

BUILDER: WASCO ENGINEERING INDONESIA

PT. MSP awarded the project and in time completed. All E&I Work Installation ±3,515mtrs cable ladder, ±1,427Lenght cable runs (±47,455mtrs cables)

upper-zakum-island-facilities.png

PROJECT NAME: UPPER ZAKUM ISLAND FACILITIES PROJECT MTR 01-12 (12 MODULES)

OwnerDSME – ZADCO
BuilderSIEMENS PTE LTD
Our Job Year2015
Cable ladders & Trays12,398 Mtrs
Cable Runs5,595 Lths
Cable Meters114,410 Mtrs
Equipment Installations2,532 Items
Tubing Installations12,129 Mtrs
gas-turbin-generator-mv25.png

PROJECT NAME: GAS TURBIN GENERATOR – MV25

OWNER: MODEC

BUILDER: WASCO ENGINEERING INDONESIA

PT. MSP awarded the project and in time completed. All E&I Work Installation ±1,092mtrs cable ladder, ±378 cable runs (±12,319mtrs cables)

lift-and-gas-compressor-mv25.png

PROJECT NAME: LIFT & GAS COMPRESSOR – MV25

OWNER: MODEC

BUILDER: WASCO ENGINEERING INDONESIA

PT. MSP awarded the project and in time completed. All E&I Work Installation ±945mtrs cable ladder, ±259 cable runs (±8,313mtrs cables)

electrical-house-wartsila.png

PROJECT NAME: ELECTRICAL HOUSE – WARTSILA

OWNER: ENQUEST

BUILDER: WASCO ENGINEERING INDONESIA

PT. MSP awarded the project and in time completed. All E&I Work Installation ±2,550mtrs cable ladder, ±902 cable runs (±27,650mtrs cables)

power-generation-madule.jpg

PROJECT NAME: POWER GENERATION MODULE

OWNER: YINSON

BUILDER: WASCO ENGINEERING INDONESIA

PT. MSP awarded the project and in time completed. All E&I Work Installation ±1,985mtrs cable ladder, ±342 cable runs (±12,509mtrs cables)

blng-regas-and-jetty.png

PROJECT NAME: BLNG REGAS & JETTY

OWNER: BAHRAIN LNG

BUILDER: WASCO ENGINEERING INDONESIA

PT. MSP awarded the project and in time completed. All E&I Work Installation ±1,093mtrs cable ladder, ±1,014 cable runs (±23,391mtrs cables)

tco-gathering.jpg

PROJECT NAME: TCO GATHERING (18 MODULES)

OWNER: TengizChevroil (TCO)

BUILDER: WASCO ENGINEERING INDONESIA

PT. MSP awarded the project and in time completed. All E&I Work Installation ±4,326mtrs cable ladder, ±3,455 cable runs (±41,674mtrs cables)

tco-area.png

PROJECT NAME: TCO AREA (5 SUBSTATION)

OWNER: TengizChevroil (TCO)

BUILDER: WASCO ENGINEERING INDONESIA

PT. MSP awarded the project and in time completed. All E&I Work Installation ±16,792mtrs cable ladder, ±18,904 cable runs (±173,330mtrs cables)

tco-siemens.png

PROJECT NAME: TCO SIEMENS (3 SUBSTATION)

OWNER: TengizChevroil (TCO)

BUILDER: WASCO ENGINEERING INDONESIA

PT. MSP awarded the project and in time completed. All E&I Work Installation ±12,904mtrs cable ladder, ±8,660 cable runs (±171,674mtrs cables)

mpv-urania-vessel

PROJECT NAME: MPV URANIA VESSEL

OWNER: RICKMERS

BUILDER: PT. SINGATAC BINTAN

PT. MSP awarded the project and in time completed. All E&I Work Repair ±300mtrs cable ladder, ±510 cable runs (±17,593mtrs cables), ±357 Equipments

karish-and-tanin-field

PROJECT NAME: KARISH AND TANIN FIELD DEVELOPMENT E-HOUSE

OWNER: ENERGEAN ISRAEL LIMITED

BUILDER: PT. SIEMENS INDONESIA

PT. MSP awarded the project and in time completed. All E&I Work Installation ±4,105mtrs cable ladder, ±1,908 cable runs (±51,208mtrs cables),±1190 Equipments, ±956 Mtr SS316 Tubings

Untitled-1

PROJECT NAME : PGM KAKINADA M75 (KG-DWN-98/2 Cluster-II)

OWNER: ONGC

BUILDER: PT. Wasco Engineering Indonesia

PT. MSP awarded the project and in time completed. All E&I Work Installation ±4,300 mtrs cable ladder, ±276 cable runs (±5,474 mtrs cables), ±102 Equipments.

Untitled-2

PROJECT NAME : SHELL LNG Canada (4 Substations)

OWNER: FLUOR

BUILDER: PT. Wasco Engineering Indonesia

PT. MSP awarded the project and in time completed. All E&I Work Installation ±2,872 mtrs cable ladder, ±2,827 cable runs (±51,080 mtrs cables), ±746 Equipments, ±100 Mtrs SS316 Tubings.

SS002 Siemens

PROJECT NAME : SHELL LNG Canada (9 Substations)

OWNER: FLUOR

BUILDER: PT. Siemens Indonesia

PT. MSP awarded the project and in time completed. All E&I Work Installation ±96,780 mtrs cable ladder, ±7,718 cable runs (±216,366 mtrs cables), ±3445 Equipments, ±270 Mtrs SS316 Tubings.